ATCO

Project Details

Gisborne was awarded total of 4 separate projects on 2 separate transmission lines. The Eastern Alberta Transmission Line (EATL) is owned by ATCO Electric and at 485KM, is the long transmission line in Alberta’s history. The Western Alberta Transmission Line (WATL) is very similar to the EATL line albeit it slightly shorter. Gisborne was responsible for design, supply and installation of fire protection systems at the transmission lines converter stations.

Design, supply and install NOVEC clean agent suppression systems, sprinkler systems, transformer deluge systems, detection & alarm systems.

  • Client Montech Mechanical
    Trotter & Morton
  • Location ALBERTA – various locations
  • Duration 16 months